ID Task Type Category Summary Status Last Edited Progress
35 Upgrade Jena1 bandwidth upgrade DCJ1-C Closed 2017-07-21
100%
33 Upgrade Jena1 bandwidth upgrade DCJ1-D Closed 2017-06-29
100%
36 Improvement Jena1 rack relocation DCJ1-B/16 Closed 2017-06-27
100%
34 Cautioning Jena1 thunderstorm warning Thuringia/Germany Closed 2017-06-27
100%
31 Incident Fra1 cooling failure Closed 2017-05-18
100%
30 Incident Dedicated Servers power outage rack a10 Closed 2017-04-24
100%
27 Implementation Datacenter power input detection for PDU-feeds Closed 2016-05-27
100%
29 Incident Involved Service reset + installsystem down Closed 2016-04-05
100%
28 Incident Involved Service power outage rack B-A-04 / epc48 feed A Closed 2016-03-28
100%
26 Incident Involved Service power outage epc53+58 (19.02.2016) Closed 2016-02-20
100%
24 Maintenance All Services ac error in unit A1 Closed 2015-12-10
100%
23 Maintenance All Services EPC/Resetsystem failure 05.11.2015 Closed 2015-12-10
100%
22 Maintenance Datacenter planned maintenance of edge switches c2950_15... Closed 2015-09-25
100%
20 Incident Jena1 power outage DCJ1-C row a Closed 2015-07-21
100%
18 Maintenance Jena1 Maintenance Air Conditioning System, 23.06.20... Closed 2015-06-23
100%
17 Implementation Jena1 upgrade security protection DCJ1 Closed 2015-04-28
100%
16 Incident Jena1 DCJ1A AC issue Closed 2015-01-28
100%
12 Implementation Jena1 install serverracks C+D Closed 2015-01-27
100%
10 Implementation Jena1 implement serial console switch for DC Core-S... Closed 2014-07-31
100%
14 Maintenance Jena1 cleaning AC for DCJ1-A and B Closed 2014-07-27
100%
13 Incident Involved Service outage cam.yard-north Closed 2014-04-04
100%
7 Upgrade Jena1 construction Datacenter Jena1 C+D+Storage Closed 2013-09-07
100%
4 Change Jena1 renumbering / harmonizing switches Closed 2013-09-07
100%
8 Maintenance Jena1 Exchange power supply hawk 2+3 Closed 2013-08-22
100%
11 Incident Jena1 air condition faulty in CR Closed 2013-08-22
100%
9 Incident Jena1 flood river "Saale" Closed 2013-07-02
100%
1 Upgrade Jena1 cabling CR21-25 Closed 2013-02-25
100%
6 Upgrade Jena1 cabling CR31 Closed 2012-12-12
100%
5 Implementation Jena1 cabling CR26-28 Closed 2012-12-12
100%
2 Change Jena1 srv583 rack change -> J1B Closed 2012-07-26
100%
3 Modernization Jena1 replacement c2950-15 Closed 2012-06-29
100%
Showing tasks 51 - 81 of 81 Page 2 of 2   --   - 1 - 2

Legend

Task Type

The type of the task. normal work for all services

Category

The category of the task. normal work for all services with upcoming tasks / announcements

Summary

A short summary of the task. active issues or failures

Status

The status of the task. service status unknown or not updated yet

Last Edited

The date when the task was last edited.

Progress

The progress of the task in percent.