3 Modernization Jena1 replacement c2950-15 Closed 2012-06-29
100%
2 Change Jena1 srv583 rack change -> J1B Closed 2012-07-26
100%
5 Implementation Jena1 cabling CR26-28 Closed 2012-12-12
100%
6 Upgrade Jena1 cabling CR31 Closed 2012-12-12
100%
1 Upgrade Jena1 cabling CR21-25 Closed 2013-02-25
100%
9 Incident Jena1 flood river "Saale" Closed 2013-07-02
100%
11 Incident Jena1 air condition faulty in CR Closed 2013-08-22
100%
8 Maintenance Jena1 Exchange power supply hawk 2+3 Closed 2013-08-22
100%
4 Change Jena1 renumbering / harmonizing switches Closed 2013-09-07
100%
7 Upgrade Jena1 construction Datacenter Jena1 C+D+Storage Closed 2013-09-07
100%
13 Incident Involved Service outage cam.yard-north Closed 2014-04-04
100%
14 Maintenance Jena1 cleaning AC for DCJ1-A and B Closed 2014-07-27
100%
10 Implementation Jena1 implement serial console switch for DC Core-S... Closed 2014-07-31
100%
12 Implementation Jena1 install serverracks C+D Closed 2015-01-27
100%
16 Incident Jena1 DCJ1A AC issue Closed 2015-01-28
100%
17 Implementation Jena1 upgrade security protection DCJ1 Closed 2015-04-28
100%
18 Maintenance Jena1 Maintenance Air Conditioning System, 23.06.20... Closed 2015-06-23
100%
20 Incident Jena1 power outage DCJ1-C row a Closed 2015-07-21
100%
22 Maintenance Datacenter planned maintenance of edge switches c2950_15... Closed 2015-09-25
100%
23 Maintenance All Services EPC/Resetsystem failure 05.11.2015 Closed 2015-12-10
100%
24 Maintenance All Services ac error in unit A1 Closed 2015-12-10
100%
26 Incident Involved Service power outage epc53+58 (19.02.2016) Closed 2016-02-20
100%
28 Incident Involved Service power outage rack B-A-04 / epc48 feed A Closed 2016-03-28
100%
29 Incident Involved Service reset + installsystem down Closed 2016-04-05
100%
27 Implementation Datacenter power input detection for PDU-feeds Closed 2016-05-27
100%
30 Incident Dedicated Servers power outage rack a10 Closed 2017-04-24
100%
31 Incident Fra1 cooling failure Closed 2017-05-18
100%
34 Cautioning Jena1 thunderstorm warning Thuringia/Germany Closed 2017-06-27
100%
36 Improvement Jena1 rack relocation DCJ1-B/16 Closed 2017-06-27
100%
33 Upgrade Jena1 bandwidth upgrade DCJ1-D Closed 2017-06-29
100%
35 Upgrade Jena1 bandwidth upgrade DCJ1-C Closed 2017-07-21
100%
37 Improvement Involved Service rack relocation DCJ1-B/15 Closed 2017-07-21
100%
19 Implementation Jena1 cabling DCJ1-D row B Closed 2017-07-21
100%
38 Incident Involved Service power issue epc76 Closed 2017-07-28
100%
25 Maintenance Dedicated Servers replacement / malfunction epc-c.c.05.01/epc91 Closed 2017-08-03
100%
39 Incident All Services switch esw-c.b.01.01 down Closed 2017-08-17
100%
40 Incident Jena1 Power outage racks CR Closed 2017-09-18
100%
41 Incident Dedicated Servers Switch outage rack c.a.2 Closed 2017-10-17
100%
32 Incident Jena1 AC water leak DCJ1-A Closed 2017-10-17
100%
42 Incident All Services partial power outage DCJ1-B Closed 2017-11-14
100%
43 Incident BK1 partial power outage BK Closed 2018-03-19
100%
44 Change Dedicated Servers relocation DCJ1-B row A Closed 2018-04-13
100%
46 Incident Jena1 Power outage network transmission equipment Closed 2018-06-15
100%
49 Change All Services relocation DCJ1-CR all rows Closed 2018-09-27
100%
52 Incident All Services power outage dcg1-moda Closed 2018-09-27
100%
45 Change All Services relocation DCJ1-B row D Closed 2018-09-27
100%
15 Upgrade Jena1 bandwidth upgrade DCJ1-B Closed 2018-10-05
100%
21 Implementation Jena1 cabling DCJ1-C row B Closed 2018-10-05
100%
50 Change Dedicated Servers relocation DCJ1-C row C Closed 2018-10-10
100%
48 Change All Services relocation DCJ1-A Closed 2018-10-15
100%
Showing tasks 1 - 50 of 81 Page 1 of 2   --   1 - 2 -

Legend

Task Type

The type of the task. normal work for all services

Category

The category of the task. normal work for all services with upcoming tasks / announcements

Summary

A short summary of the task. active issues or failures

Status

The status of the task. service status unknown or not updated yet

Last Edited

The date when the task was last edited.

Progress

The progress of the task in percent.